Laserfiche WebLink
• <br />Table L-4 GCC Rio Grande Portland Cement Reclamation Cost Estimate Bulldozer Work <br />BULDOZER WORK <br />Description Cross-Sectional Area Linear Feet Loose Volume Unit Cost Total Cost MEANS Reference <br /> SF LF LCY $/LCY $ <br />Backfill Conveyor Corridor- Cross Section B-B' 1,770 1,740 114,067 $ 0.43 $ 49,048.67 23151205020 <br />Backfill Highwall -Cross Section A-A' 1,537 9,600 546,489 $ 0.43 $ 234,990.22 23151205020 <br />Backfill Pit Highwall =Slope 4:1 -Crass Section C-C' 698 1392 35,986 $ 0.43 $ 15,473.88 23151205020 <br />I $ 299,512.77 I <br />Note: MEANS reference based on 300hp track Dozer - 50' push <br />L_g 7-OS-02 <br />