2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. (1) Reclamation Timetable <br />Timing and locations of topsoil removal and replacement within the upper refuse disposal and the <br />facilities site are shown on Map 57 and Map 56. It is uncertain at this time however, when (or if) <br />the upper refuse disposal site will be constructed. The timing of topsoil removal and replacement <br />within the lower waste coal disposal site is described in Exhibit 51. <br /> <br />Reclamation of the Refuse Pile Expansion disposal area will begin promptly as each phase of <br />deposition of the refuse coal is completed and will follow the procedures described in the <br />Reclamation Methodology Section and in Exhibit 50 and Exhibit 5 L The Lower Refuse Pile will be <br />used as a storage azea and will be reclaimed when no longer required for a storage area. Refuse pile <br />compaction and stabilization, topsoil replacement, and revegetation will occur as portions of the <br />refuse disposal azeas are completed. Disposal in the designated azeas are also discussed in the <br />Reclamation Methodology Section, Exhibit 50, and Exhibit 51. <br />The surface facilities site and other disturbed areas at the West Elk Mine will be reclaimed as <br />described in the Reclamation Methodology Section. Permanent reclamation of operational azeas <br />will not commence until actual mine operations cease, in approximately 40 yeazs. Table 41A <br />provides a timetable for the major reclamation tasks, other than reclamation of the refuse piles. <br />Removal of the sedimentation ponds is not included, as they will not be removed until vegetation <br />has been established following completion of the major reclamation tasks. <br />Table 41A Time Table for Major Reclamation Tasks <br />RECLAMATION TASKS APPROXIMATE TIME TO COMPLETE TASK <br />MAIN MINE SITE <br />Remove buildin s/structures 16 Weeks* <br />Backfill mine ortals & S lvester Gulch Fan Portal 12 Weeks* <br />Backfill and Grade 16 Weeks <br />Re lace to soil 8 Weeks <br />Seed 2 Weeks <br />LONE PINE GULCH <br />Remove buildin s/structures 6 Weeks <br />Backfill fan ortals 4 Weeks <br />Backfill and Grade 6 Weeks <br />Re lace to soil 3 Weeks <br />Seed 2 Weeks <br />NORTH SOIL STORAGE AREA <br />Backfill and Grade 6 Weeks <br />Re lace to soil 3 Weeks <br />Seed 1 Week <br />SYLVESTER GULCH FACILITIES AREA <br />Remove buildin s/structures 12 Weeks <br />Seal shafts #1, #2, and #3 12 Weeks <br />Backfill and Grade 16 Weeks <br />Re lace [o soil 14 Weeks <br />Seed 3 Weeks <br />* Tasks could occur concurrently <br />1.05-84 Revised Dec. 1997 MR208; Revised Jun. 1999 TR90 <br />Revised May 2003 MR-194; Rev. Apri11006 PR/0 <br />