Laserfiche WebLink
• <br />• <br /> <br />Table 36 Approximate Topsoil Stockpile Volumes for West Elk Mine Site <br />Location/Name' Reclamation Stork ~) Storage (c.yJ <br />Destination Upon Maximum Actual9 <br />TOPSOIL STOCKPILES <br />Main Mine Site & Lone Pine Gulch <br />• Main Stockpile <br />• Materials Storage Bench Stockpile <br />• Water Tank Stockpile <br />• Pazking Lot Stockpile <br />• Lone Pine Gulch Stockpile <br />• Topsoil Stockpile #5 <br />• North Soil Stora e Area (NSSA) <br />• Lower Refuse Pile (LRP) Stockpile <br />• Refuse Pile Expansion (RPE) Stockpile <br />• Sylvester Gulch Facilities Areab <br />• Shafts Site Stockpile <br />• Topsail Stockpile #1 <br />• Topsoil Stockpile #3 <br />• Power Pole 9 <br />• Power Pole 11 <br />• Power Pole 12 <br />• Power Pole 13 <br />• Power Pole 14 <br />• Power Pole 16 <br />SUBSOIL STOCKPILES <br />• Main Mine Site & Lone Pine Gulch <br />• Lone Pine Gulch Stockpile (Staging Area) <br />• S~vester Gulch Facilities Area <br />• Live Subsoil Stockpile #1 <br />Live Subsoil Stockpile #2 <br />Main Mine Site --- 84,800 <br />Materials Storage Bench --- 11,000 <br />1998 ROM Expansion 53,000 6,200 <br />Parking Lot Expansion --- 250 <br />Lone Pine Substation & Fan --- 5,4502 <br />1997 MSB Expansion 20,500 ? <br />Lower Refuse Pile --- 19,4003 <br />Refuse Pile Expansion --- 16,4058 <br />Shaft Site 50,000 49,9006 <br /> 18,650 11,0006 <br /> 35,710 35,7106 <br />Pole 9 Road 25 <br />Pole 11 Road 180 <br />Pole 12 Road 50 <br />Pole 13 Road 45 <br />Pole 14 Road 140 <br />Pole 16 Road 30 <br />Lone Pine Gulch Fan --- 26,100 <br />Lower Refuse Pile & Various 58,000 Varies4'7 <br />Various 15,200 Vazies7 <br />Notes: <br />1. Volume calculated by Envirocon, Inc. Based on the 1993 topsoil pile relocation designs and utilizing original (1996) <br />contours and contour survey of the pile conducted in 1993 by Messenger & Associates. <br />2. Includes approximately 400 c.y. at the Lone Pine substation and approximately 3,s00 c.y. for the Lone Pine mine water <br />treatment pond. (Not Constructed) <br />3. Volume calculated following LRP reconfiguration (IR78), July 1996. <br />4. Approximately 13,270 c.y. will be kept in Stockpile at all times for reclamation at Lower Refuse Pile <br />5. For topsoil and subsoil stockpile locations, see Map 53, 53A, and 53B <br />6. As-Built volumes from Nielson's Topographic Survey (Nov. 1997). <br />7. The volume of Live Subsoi] Stockpiles will vary as soil is added to and removed from the pile for construction projects. <br />Soil is not needed for reclamation, other than as noted in Footnote 4. <br />8. Acrual storage volumes will vary depending on the phase of construction and reclamation of the RPE area See Table 1 in <br />Exhibit 70, which details the amount of soil [hat is stripped during each phase. <br />9. Unless otherwise specified, actual storage volumes have been estimated as of August 1998. <br />1.05-52 Revised Jul. ]996 MR190; Revised Nov. 1996 PR07; Revised Jan. 1997 TR79; <br />Revised Jul. 1997 TR81; Revised Sep. /997 MR225; Revised Oct. 1998 TR86 <br />