My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132469
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:13 PM
Creation date
11/26/2007 12:12:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
6/2/2006
Section_Exhibit Name
2.05.4 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
West Elk Mine <br />Reclaimed Area Monitoring Plan <br />Vegetation monitoring at the West EIk Mine will encompass both interim and final revegetation <br />monitoring. Interim revegetation monitoring will be conducted on the Lower Refuse Pile for the <br />purposes of evaluating revegetation plan elements, including, but not limited to, seed mix <br />components, application rates and methods, and mulching. Generally, newly revegetated azeas <br />exhibit annual "weed" dominance for the first one to three yeazs after seeding. Since this <br />occurrence is widely acknowledged as normal in revegetation scenarios, information obtained from <br />sampling during this period is not particulazly useful. Mountain Coal Company does not plan to <br />undertake any interim monitoring while annual "weedy" species are dominant. For this reason, <br />MCC proposes interim revegetation monitoring after the perennial revegetation species have <br />become well established. <br />Final reclamation monitoring of the revegetated mine site will commence in the second yeaz <br />following seeding, in accordance with the definition of the extended liability period. Monitoring <br />will take place during yeazs 2, 4, 6, 9, and 10 of the liability period. Sampling methods and <br />statistical analysis will be consistent with those described in Section 2.05.4 of the MRP. <br />Grazine Success <br />Dwing the last two years of the 10-year liability period, a grazing program using domestic livestock <br />will be instituted. Grazing will occw at a capacity and management level consistent with that for <br />adjacent properly managed non-mined lands. <br />Although grazing with domestic livestock is preferred, grazing trials may preclude or interfere with <br />post mining vegetation sampling or operational requirements. In this case, grazing studies will be <br />substituted for the direct use of livestock. These substitute studies will involve clipping large plots <br />during normal periods of grazing to simulate grazing by livestock. Regardless of which grazing <br />method is used, herbaceous production and cover will be estimated on both affected and reference <br />areas. Data from affected and reference areas will then be compazed using t-tests. <br />fl2ricultural Monitoring Plan <br />When the West Elk Mine was originally permitted, an annual survey was used to conduct <br />agricultwal monitoring. After each growing season, landowners with agricultural lands in the North <br />Fork Valley were surveyed. The survey consisted of interviewing each landowner orally. Results of <br />this survey are contained in Exhibit 9. <br />After the 1982 survey, OMLR and Mountain Coal Company determined the annual survey was no <br />longer necessary. Both found mining practices and monitoring programs in effect at the West Elk <br />Mine sufficient to ensure that the mining operation would not significantly degrade water quality or <br />reduce water quantity in the North Fork of the Gunnison River. There is little, if any, chance the <br />mine would affect the North Fork AVF. Based on these considerations, OMLR determined the <br />yearly agricultwal monitoring program was of little value and could be discontinued. Therefore, <br />Mountain Coal Company ended the agricultural monitoring program after the 1982 survey. <br /> <br />RevisedNw. /996 PRO7; Rev. Apri[2006 PRIO <br />1.05-70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.