Laserfiche WebLink
EXHIBIT 2.05 - E1 <br />FACILITIES DESIGNS <br />TABLE OF CONTENTS <br />Powerless, Roads, and De-Gas Drillholes (Hubbazd Creek -Dwg. E8-3229) <br />Hubbazd Creek Ventiladon Facilities No. 2 -Powerline Layout (Dwg. E8-3357, 3 sheets) <br />Upper Hubbazd Creek Ventilation Facilities -Permit Area and Facilities (Dwg. E8-3351 R) <br />Upper Hubbazd Creek Facilities -Cross Sections A-A' through D-D' (Dwg. 7) <br />Lower Hubbazd Creek Facilities (Dwg. C8-1122) <br />Lower Hubbazd Creek Facilities -Existing Facilities and Topography (Dwg. C8-1199) <br />Lower Hubbazd Creek Facilities -Cross Sections A-A' through D-D' (Dwg. 9) <br />Lower Hubbazd Creek Facilities -Cross Sections A-A' through D-D' (Culvert) and E-E' duough F- <br />F' (Dwg. 10) <br />Beaz Canyon Fan and Watet Tank Location and Topography (Dwg. C8-787A) <br />• Bear Canyon Ventilation Facilities -Cross Sections A-A' though G-G' (Dwg. 8) <br />Elk Creek Facilities -Powerline Relocation and Access (Dwg. 5-101) <br />Conceptual Coal Handling Schematic (Dwg. S-098) <br />Elk Creek Facilities -Coal Sampling System (Dwg. 5-048) <br />Elk Creek Facilities - Loadout Weight System (Dwg. 5-033) <br />Elk Creek Facilities Area -Road Plan, Cross-Sections, and Profiles (Dwgs. C8-1262, C8-1230, C8- <br />1261, and 2.05-M3) <br />Sanbom Creek Mine - C-Seam Portal Plan and Profile (Dwg. S-096) <br />Sanbom Creek Mine -Haul Road and Conveyor Plan and Profile (Dwgs. 5-016 and 5-017A) <br />Sanborn Creek Mine -Deer Underpass Locations and Details (Dwg. 5-015) <br />Hubbazd Creek Fansite (Dwg. 2.05-El-HFS) <br /> <br />