My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132388
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132388
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:33:09 PM
Creation date
11/26/2007 12:08:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
Permit File
Doc Date
12/20/1977
Doc Name
REGULAR 112 PERMIT APPLICATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT D <br />MINING PLAN AND STAGES <br />Mining Plan. The property known as Lamar East Pit was <br />' purchased in 1948 by Lamar Concrete Products Co. which later <br />became Valco, Inc. It was, in fact, the first pit operated <br />' by this company. Excavation of sand and gravel began in the <br />same year. Current land use is mining and unused river bottom <br />' and floodplain. <br />' Open pit mining was initiated in the southwest portion of <br />the property and progressed to the central part of the area <br />' lying west of the railroad and south of the river (see map Ex- <br />hibit D-1). A gravel plant is located on approximately 4.71 <br />' acres + in the center of this western area. The plant site will <br />' not be excavated. <br />Mining of the remainder of the deposit will be conducted in <br />' nine stages. This staging will serve to minimize surface dis- <br />turbance at any one time. After Stage D is complete in 1978, <br />mining will be conducted in the area east of the railroad.. Ex- <br />' cavation will proceed from east to west starting with Stage 1 <br />and progressing through Stage V Part 1. Stage V Part 2 a.nd Stage <br />V1 will also be excavated from east to west. The mining of these <br />nine stages will create four lakes which will become part of the <br />' reclamation plan (see Exhibit E). Each mining stage will be <br />approximately five years, except the last stage which will last <br />three years. Stages Y and Z will operate only intermittE:ntly <br />i <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.