Laserfiche WebLink
State Highway Access Permit p~@ t <br />Attachment to Permit No. 103039 -Additional Terms and Conditions <br />I. A Notice to Proceed, COOT Form 1265, is required before beginning construction of the access or any activity <br />in COOT Rightrof--Way. All submittals, documents, plans and other items that must be completed, shall be <br />submitted and approved before a Notice to Proceed for construction will be issued. Contact the Department <br />for the Notice to Proceed. <br />2. If there are any questions regarding this permit, please contact Chuck Binford, COOT Access Manager, at <br />303-757-9123. <br />3. Incorporated as part of this permit will be the following: <br />Application for Access Pemtit (COOT Form No. 137) <br />The Permit (COOT Form 101}and its two page attachment (COOT Form 101B) <br />Notice to Proceed <br />Construction Plans <br />Signing and Striping Plans <br />Certificate of Insurance (To be submitted to COOT prior to beginning construction in COOT Rightof--Way) <br />Q. If necessary, minor changes, corrections, and/or additions to this permit maybe ordered by the Department <br />inspector, other Department representlves or local authority to meet unanticipated site conditions. Changes <br />may not be in violation of the Code. <br />5. Left tum movements in and out of this access may be prohibited at some future date. <br />6. This access shall be used only for commercial purposes with the vehicular volume using the access during the <br />Peak Hour not to exceed 15 vehicles per how. <br />7. This access permit is not valid unless the proposed use is approved by Gilpin County. <br />8. The Permittee is responsible far obtaining any necessary additional federal, state, and/or city/county permits or <br />clearances required for construction of the access. Approval of this Access Permit does not constitute <br />verification of this action by the Perntittee. <br />9. The Pemrittee shall provide tfie Department and /or the issuing authority with the following information prior <br />to commencement of any construction activities beyond the existing curb and gutter or paved area, within <br />COOT Right-of--Way: <br />A. Written clearances for Threatened or Endangered Species. <br />B. Wetlands clearances. <br />C. Archaeological and Paleontological clearances. Any discoveries shall be mitigated in conformance with <br />section 107.23 of the standazd specifications for road and bridge construction, latest edition. A surface survey <br />must be performed and a written clearance provided to the Dcparanent and/or issuing authority prior to <br />commencement of any construction. <br />It is the responsibility of the Permittee to asswe that no such sites are present prior to commencement of <br />construction activities. All identified sites shall be mitigated to the satisfaction of the appropriate agency prior <br />to proceeding with work activities. <br />Wetland mitigation shall be completed in conformance with the policies, procedwes and regulations of the <br />Army Corps of Engineers, Pederal Highway Administration and the State of Colorado, as may be applicable. <br />10. All costs associated with the installation of this access are the responsibility of the Pernuttee. This includes <br />the design, construction, utility relocations, testing of materials, and inspections. <br />11. Any work within COOT ltightrof--Bray shall begin afler 8:30 am and all work and equipment shall be off the <br />