Laserfiche WebLink
~~- <br />4. <br /> <br />~'~1 NERALS 07NER THAN OIL AND GAS. C- 0125439 <br />THE BUREAU OF LAND MANAGEMENT IS RESPONSIBLE FOR THE PROPER MANAGEMENT <br />OF PUBLIC LANDS TO PERMIT THEIR MAXIMUM MUL7IPLE USE. IT 75 CONSISTENT <br />WITH THIS RESPONSIBILITY TO ENCOURAGE MgXIN,UM MINERAL DEVELOPMENT IN <br />ACCORDANCE WITH PUBLIC NEEDS, DN THE OTHER HANDS IT IS NECESSARY TO RE- <br />QUIRE OPERATING PRACTICES WHICH WILL INSURE ADEQUATE PROTECTION OF OTHER <br />NATURAL RESOURCES, TO ACCOMPLISH TH ISM THE PERMITTEE OR LCSSEE HEREBY <br />AGREES TO THE FOLLONING STIPULATIONS: <br />STIPULATIONS <br />I. AT LEAST TWO WEEKS BEFORE BEGINNING ANY CLEARING, CONSTRUCTION, OR <br />DPERATIONS~ INCLUDING ACCESS ANO WORK ROAD LOCATION AND CONSTRUCTION <br />THE PE RI!ITTEE OR LESSEE, IN COOPERATION WITH THE DISTRICT MANAGER <br />SHALL PREPARE AN OPERATING PLAN FOR SURFACE PROTECTION. SUCH PLAN <br />WILL BE CONDITIONED ON REASONABLE RE OUIREMENTS NEEDED TO PREVENT <br />SOIL EROSION, WATER POLLUTION, AND UNNECESSARY DAMAGES TO THE SUR- <br />FACE VEGE7 AT ION AND OTHER RESOURCES OF THE UNITED STATES AND TO <br />PROVIDE FOR THE RESTORATION OF THE LAND SURFACE AND VEGETATION. <br /> Z. PROSPECTING SITES ARE TO BE CHOSEN WHERE POSSIBLE WITH A MINIMUM <br /> DISTURBANCE TO THE NATURAL BHAUTY OF THE AREA. <br /> 3. ROADS ARE 70 BE KEPT TO THE MINIMUM NECESSARY AN D ARE TO BE BUILT <br /> WITH A MINIMUM OF DISTURBANCE TO THE SURFACE. <br /> 1111 <br />4, AFTER COMPLETION OF PROS PE CTING~ ALL EXCAVAilONS ARE TO BE FILLED <br /> AND TO THE EXTENT POSSIBLE RESEEDED AND RESTORED TO AS NEARLY AS <br />~ POSSIBLE TriE ORIGINAL CONDITION. <br /> 5. ALL DISTURBED SURFACES SHALL BE SEEDED WITH 5' POUNDS OF CRESTED <br /> WHEAT PER ACRE. <br /> 6. ALL TRASHY DEBRIS, AND FOREIGN MATERIAL ARE TO BE REMOVED FROM THE <br /> SITE. <br />7. NO BURNING IS TO BE ALLOWED WITHOUT WRITTEN PERMISSION OF THE DISTRICT <br />MANAGER. <br />8. NO WATER IS TO BE REMOVED FROM STOCKPONOS AND STREAMS WHERE SUCH <br />WATER IS NEEDED FOR STOCKWATERING PURPOSES, <br />9, NO CONTAMINANTS ARE TO BE AI.I ONLD TO F. 11T ER SI RF.ANS OR ST OCKPONDS, <br /> <br /> <br /> <br />I~IIF LAND COVERED B'I THIS STIPULATION IS AS FOLLOWS: <br />t. 7 S., R. 102 W., 6th P.H. <br />Sac. 9: '±~:ts 1-22 ,Incl.,, 'r.;SE~, <br /><.' - - - - - <br />nw'i~„t, ~w~N.i~~ .'+~ki .~ <br />Sec. 15: Nii}. I~SN~, Lots i-'4 incl. <br />Sec. 16: Lots 1-24 incl., F.~NB~, <br />Sec. 21: Lots 1-18 iacl., NW'xNH}, ,. <br />S~NE~, SSA - <br />Sec. 22: Lots 3-10, 15. 17, 19. 22 ~ '~..- ' <br />PERMITTEE OR LESSEE <br />IAIDUSTRTnr RESOURCES, INC. <br />