Laserfiche WebLink
STAq~F.~~nCOLORADO <br />OFFICE OF THE STATE ENGINEER ~' MAY 1 3 2005 ~ <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 Division of Minerals and Geology <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 RCSpOriSe t0 ReClamahori Permtt AppllcatlOn CO11SldeTatlOn <br />FAX (303) 866-3589 <br />www.watecs[ate.co.us <br />DATE: May 13, 2005 / <br />TO: G. Russell Means, Environmental Protection Specialist <br />OF' CO~ <br />N~0 <br />r + <br />kK <br />~' I876 ; <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CC: Division 4 OfSce; District 41 Water Commissioner <br />FROM: Cynthia J. Love, Water Resource Engineer~~ <br />RE: Operator: Nick H. Gray, Gray Pit #2, File No. M-2005-012 <br />Section 36, Twp 49N, Rng 8W, N.M. P.M., Montrose County <br />Landowner- Nick H. Grav <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occlu during or afrer mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclarnation, ^water <br />removed in the mined product, ^processing, ^othec <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or other type <br />of well per[nit, as applicable. Prior to obtaining a pemlit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well pemilt, the applicant must conduct a field inspection of the site and doctunent the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from atl well owners with wells within 600 feet of the permit area or contact [his office regarding the <br />600 foot spacing notificatiotl/ltearing process. <br /> <br /> <br />The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />The applicant has indicated plans to use other water for: Dust suppression at the pertr¢t site. <br />Other: <br />COMMENTS: The owner's permitting contact, Timothy M. Scanion, has provided more detailed infomla[ion in his <br />Apri123, 2005 letter regarding water use at the project site. Contract operators will supply their own water needs from <br />offsite sources by purchasing and hauling in water for dust suppression. The applicant has sufficiently addressed the <br />concerns noted in my March 18, 2005 Response. <br />