Laserfiche WebLink
a <br />BOETTCHER <br />SANDSTONE <br />QUARRY <br />-~ ~ <br />EXHIBIT E <br />RECLAMATION PLAN <br />^ <br /> <br />I No soils have been encountered on the current second bench <br />'' operation. If practical to recover any soils in the future, they <br />~' will be stockpiled for use in reclamation. Otherwise, when <br /> mining is completed, the sides will be graded with a 3ozer <br />~ ' similar to those which exist on the neighboring land. A.little <br />t <br /> help to scatter seed from adjacent neighboring vegeta~;ion in <br /> <br /> <br />':, ' the fall after mining is completed is probably adequai:e on this <br />~ <br /># <br />' rough hillside. <br /> <br />i It does not appear that any reclamation work wil] be <br />I; '' practical until mining stops 50 or more years in the future. <br />~~' <br />r <br />r> <br />4' 1 <br />' <br />; <br /> <br />K , <br />~-0 <br /> <br />t~ <br /> <br /> <br /> <br /> <br /> <br />r <br />