Table E-5
<br />Mamm Creek Sand 8 Gravel Pit
<br />Proposed Reclamaton Phasing a' Area
<br />Rerswable resource is assumed b be reclaimed to a back wale area antes rher reallpna the main channel to inundate This nw.
<br />Upper and dug deep enough to fdl with mods. Slopes reclaimed to 3:luslnp sdslirp motive mderiah. Assumed beckwder eurlace elewtion =5332.
<br />Reclamation timing begins with the West Properly Line to Hasa Fence Mining Area es the Renewvde Reeounx arw
<br />is assumed b tb mined umil beyorM the 18e d the mda8ry p8e. Monies will be irwluded in the retlamallon borM adimale
<br />la reclamation ehorrN the Cdaado Riper main channel nd change to include thin area.
<br />Reckmdion timing assurtros that 25.30 acres sulydinp fiw Rerrewabb Reswrce arw will M open N erry one time
<br />In a mining arw due to the thklmeas d preset.
<br />• Mae retlaimed is based on acres mined end Irwiudw lake arw and ahoro fins arw.
<br />Actual reclamation frobilily ti based on shore line. wetlands, arWa range land b reclaim.
<br />•
<br />Deficit Aor fill is assumed to cane Intro 5% bas in mtninp and proceasinp d wrfd end prorol. See Table E-3. Metedel Balance Summary
<br />
<br />Toped) 6
<br />pker opsw
<br />OrarWrden
<br /> Orwpurdsn ShorNlro Feel Wdfand Matrlal Placed Shoe Llro Stoclgile
<br /> Taro Aeres Renfaed E~wed Slrordlro Rsdalmad OrarWrden Topsoil Ramabinp Capatlly
<br />Period Ywra Ama Mrrad Mrod Qr. Yds. Feat Ratldmed Fad Cu. Yda. Cu. Yda. Fed w. C.arnmerda
<br />ear 1 enswabb asourq intl. 1. 1 mad teat a
<br />Yen 2 Renwwhb Resource nd. S 172, 6 15.02 3,211 5A75 15,859 recWlrrisd river
<br /> S -Wad Rto Fence 27,221 0.92 2,188 99 99 2.188
<br />Year 3 5 -Wad R to Fence 200,000 8.73 18,075 729 828 18,263
<br />Ysn 1 S -Wed R to Feroa 200, 8.73 18,075 729 484 5,880 220 1,093 28,138
<br />Ywr 5 5 -West R b Fenw 200,000 6.73 18,075 729 1,09:1 13,394 S1H 729 30,800
<br />Tod115 900,000 IS 50,112 2,288 1,567 19,071 738 729 30,600
<br />Ywr 8 S •Wed R b Fence 200,000 8.73 18,075 729 729 300 26,090 318 729 20,239
<br />Ywr T S -Wed R b Fence 200,000 6.73 18,075 729 729 300 28,090 316 729 9,578
<br />Yes 8 S •Wad R b Fence 200,000 8.73 18,075 729 729 250 2330 318 729 2,078
<br />Ywr 9 S •Wed R b Fence 200,000 8.73 18,075 729 729 200 20,370 318 729 ,583
<br />Yan 10 S •WwtRto Fence 1d1,6f1 3.53 6,121 382 729 115 17,223 316 381 (11,708
<br /> 8 h b Ead PL 96,168 2.77 5,872 528 382 5,578 210 528 17,521 Finidrea WRliF Arw
<br />ToW 8.10 1,000,000 33IJ 78,395 redamdion
<br />
<br />11-1 5 h b Eatl PL 1,000,000 29.08 59,589 S,S12 5,560 0 81,019 3,188 519 (19,2M Stade SLEP Ares
<br />TMd 11-IS
<br />
<br />1620 5 h b East PL 206,612 8.01 12,312 1,115 1,681 250 32,381 1,015 0 (10.381
<br /> Wed End 793,368 13.98 166,282 2,808 2,006 0 97,160 2,115 600 87,007 Starts Wed End Pit
<br />alai 18-20 1,000,000 176,596 3,861 3,870 250 129,514
<br />20-25 Wed End 363,215 8.78 80,322 1,355 2.156 0 101,313 2,271 -0 X16,312
<br /> Creek 350,961 12.86 73,389 2.818 2,818 575 51,173 2,681 0 18,255 SWrb Creek
<br />ToN120-25 731