Laserfiche WebLink
Tahle E-3 <br />Mamm Creek Sand 8 Gravel Pd <br />Mmss Batar>ce Summary <br />Notes: Topsoil and Ovcrtwtden needed g based an difference behveen <br />Bra boltam of gravel pit surface Indudirg higtavelb end the post minirrg <br />slopes required to form the takes plus gradlfrg o/ topadl end surface facllNy areas. <br />Topsoil and overburden availabkl fs based t1n the difference betreen the existing <br />ground surface and the assumed botiarn of overburden elxatlon. <br />• A 5% mining and processing kss of mimed materials k assumed to be placed beck Into <br />8ie pits (or reclamation. <br />A positive variance means sld8eierd material ava8abk /or reclamation. a rxga8re vartarke fa <br />the amount of intent material that needs to be Imported from ouhide sources. <br />Vdumes are ncl adjusted for k/sees due to compaetbn whkh are assumed to be 20%. <br /> <br />R krrad Area, Aces Depth <br />of TopsoN <br />T '1 Vdume Overburden <br />Needed Overburden <br />Available Processslrg <br />Rejects 5% f+laterWl <br />AvaOable <br />Variance <br />Arm R rfen R Total Feet Cu. Ft. Cu. Yd. Cu. Yd. Cu. Yd. Cu. Yd. Cu. Yd. Cu. Yd. <br />eat rd 1 86 248, 1 , <br />MY Creek 220 2.2 0.75 71,874 2,882 57,172 73,501 17,548 91,049 33,878 <br />Sough fo East PL 3.98 3.96 0.75 129,373 4,792 123,572 77,120 ,090 142,209 18,637 <br />est PL to Horse Fence (Srryder) 205 2.06 0.75 86,971 2,481 134,559 123,304 76,602 199,906 85,347 <br />Total_ _ _ _ 13.83 2.67 18.50 539 055 19985 520 088 520 599 218 071 738670 218583 ~ <br />L~ <br />