Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources Permit #~ - 03-ODD Confidenta?: <br />Department of Natural Resources CIBSS: G'Yl~rf Type-Seq.: <br />1313 Sherman Street, Roam 818 From: AS.e T^o: <br />Denver, Colorado 80203 DOG. Name: ,~, ~eM~ rc.Lr.l' ~-,., <br />Phone 1303) 866-3581 Doc. Date (if no ate stamp): s" 0.3 <br />FAX (303) 866-3589 <br />www.wa[ecstate.co.us <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office; District 1 Water Commissioner <br />FROM: Joanna Williams, Water Resource Engineer <br />DATE: February 5, 2003 <br />RE: Nissen Farm Resource, File No. M-2003-001 <br />Section 12, Twp 5 N, Rng 65 W, 6th P.M., Weld County <br />Operator: Hall-Irwin Corporation <br />Contact: Hall-Irwin Corporation <br />3026 4th Ave. <br />P.O. Box 2150 <br />Greeley, CO 80632 <br />970-352-6057 <br />pF'GO~\ <br />O <br />Ne ERs , <br />',~$ <br />~• r' <br />~~ 1896 3/ <br />Bill Owens <br />Governor <br />Greg E Watcher <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ®processing, ®other Concrete <br />hatching. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: <br />