Laserfiche WebLink
-. ~ ,-~ ~ ~ III I II III I II IIII III <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO 60203 <br />303 6663567 <br />Fnx: 303 632-8106 <br />June 20, 1990 <br />Mr. Donald W. Wilson <br />Leadville Mining 8 Milling Corp. <br />100 Carr Street <br />Lakewood, CO 80215 <br />Re: M-90-057, Hopemore Shaft, Permit Issuance <br />Dear Mr, Wilson: <br />pF' COQ <br />ti~ -07 <br />~`%~18 <br />.. ;~~. <br />Roy Romer, <br />Governor <br />Fretl R. Banta, <br />Division Director <br />On June 18, 1990, the Mined Land Reclamation Division found Leadville Mining 8 <br />Milling Corp, to have satisfied the applicable requirements of <br />C.R. S, 34-32-101 et seq. for obtaining a mining and reclamation permit, <br />Therefore, a permit is being issued. Two signed originals of the permit have <br />been executed. We have kept one copy for our files and are enclosing one copy <br />for your use. Please read the terms of the permit. It is your responsibility <br />to comply with all of the terms of the permit. As a reminder, here are a few <br />things we feel are important. <br />1. All of the original application materials, as amended and supplemented, <br />are an integral part of your permit. They have been incorporated into the <br />permit by reference. We presume that you have a copy of all of these <br />materials; therefore, none have been enclosed with this mailing. We suggest <br />that you keep a copy of the permit and the permit application at the mining <br />operation as a reference for operating personnel, to help ensure compliance <br />with the terms of the permit. <br />2. Chanyes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Minerals Rules and Regulations and/or contacting us to <br />determine if a revision to the permit is necessary. Rule 1,8 pertains to <br />Amendments, Rule 1.9 to Technical Revisions, and Rule 1,10 to Conversions, <br />3. On your permit anniversary date each year, June 18, you must submit an <br />annual fee and an annual report to us, The annual fee for this permit is <br />$50.00. Please consult Rule 3.4 for 110 Permits, and Rule 2.4 for 112 <br />Permits, and Statute Section 34-32-116(1)(a) for 111 Permits, for the specific <br />annual report requirements applicable to your mine. <br />If you have any questions, please contact me. <br />s' c y <br />F R~ TAr <br />Director <br />FRB/dlm <br />Enclosures <br />8037G <br />