Laserfiche WebLink
Roadable equipment <br />_________________ Total Eqp. <br />Machine Description Cost/hr <br />Drill Atg 5120.00 <br />Ptckup truck $29.37 <br />Flatbed truck $35.01 <br />Water truck (37.02 <br />Fleet Size Haul irtp Return irip <br />(no. hauled) Cost/hr Cost/hr <br />! $120.00 $120.00 <br />1 (29.31 f29.31 <br />1 $35.01 E35.07 <br />1 $37.02 (31.02 <br />Subtotals $221.46 $221.46 <br />sheet 2 of 2 <br />MOB/DEMOB SUPPORT EAUIPMENi: <br />Weight Ownership Haul Rtg Fleet Site Haul Trip Return Trtp DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />Subtotals <br />total Eqp. Fleet Size Haul Trtp Return Trtp <br />Roadable Eqp. Descrtptton Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals <br />EAUIPMENT HAUL DISTANCE 6 TINE <br />Nearest ma0or city or town within pro0ect area region: Steamboat Springs <br />Total one way travel distance = 20.0 miles . Average travel speed = 35.00 mpn. <br />JoD Time - Non Roadable Equip.= 0.50 hours load Roadable Equip.= N/A hours load <br />0.51 hours haul 0.51 hours haul <br />0.50 hours unload N/A hours unload <br />0.51 <br />------ hours <br />------ return <br />--------- 0.51 <br />-------- hours <br />----- return <br />------- <br />JOB COST <br />iotai Mob/Demob Cost = $800.99 <br />NOTE: flan-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOi requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig tlepentling on degree of overstzej are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the Job site. Costs for lifting equipment and other <br />support equipment needed for this work should De included in the mob/demob costs. <br />