Laserfiche WebLink
I <br />• <br />L J <br /> <br />2.05.3 Ooeration Plan -Permit Area - Preface <br />Revised <br />Jluy 2$,1982 <br />Based on current knowledge, the maximum production rate at the mine is <br />expected to be on the order of 290 tons/day. For the first year produc- <br />tion in the Cameron seam is estimated at 57,600 tons. This will occur in <br />8.1 acres of the pit labeled 1982(2). See Map (6). Based on this <br />production rate, the second year mining will continue in the 1982(2) pit <br />and continue to the 1983(3B) pit where the"A" seam will be mined. <br />During the second year, production is expected to be on the order of <br />90,000 tons/year. The first year production will be less due to the time <br />required to develop the surface facilities and stockpile the topsoil and <br />subsoil. A summary of the operation is given in the following table: <br />Disturbed <br />Year Tons mined/year Area, Acres Pit Notation <br />Oct 82 - Sept 83 57,600 <br />Oct 83 - Sept 84 90,000 <br />A description of production methods and equipment follows <br />is presented in 2.05.3(2). <br />8.1 1982(2) <br />12.0 1982(2), 1983(3B) <br />A timetable <br />C.v ~ ~~~ <br />