Laserfiche WebLink
,~. <br /> <br />Table 2.3 <br />/Table 5. Water and Sediment Runoff Summary for <br />Newlin Creek (10-year storm event). <br /> Average <br />Total Total Suspended Peak Peak <br />Water Sediment Sediment Water Sediment <br />Unit Runoff Runoff Concentration Discharge Concentration <br />(ac-ft) (tons) (ppm) (cfs) (ppm) <br />SW-1 54.6 430 5,790 963 --- <br />SW-2 42.6 182 3,135 808 --- <br />Sw-3 - 43.9 56 935 387 --- <br />CH-1 83.0 775 6,875 851 14,130 <br />CH-2 102.7 3,751 26,870 1,676 37,960 <br />CH-3 214,1 7,527 25,860 2,540 36,000 <br />CH-4 213,7 7,818 26,920 2,470 36,590 <br />CH-8 213,5 4,302 14,830 2,325 24,090 <br />N from G.E.C. S.O.A.P. report <br />3b ~~1 Z V <br />