Laserfiche WebLink
SEDCAD 4 for Windows <br />it CCFy'~9M 199e Pamela J. Schwab <br />Civil Software Design <br />6 <br />• <br />St~uctu~e ,~1 lPon>~ <br />Pond 14 <br />Pond Inputs: <br />Permanent Pool Elev: 7,385.00 <br />Permanent Pool: 4.39 ac-k <br />'Sediment Storage: 6.08 ac-k <br />Dead Space: 20.00 <br />Emergency Soilfwav <br />• Spillway Elev Crest Leng[h Lek Right Bottom <br />(ft) Sideslope Sideslope Nlidth (k) <br />7,387,50 30.00 3.00:1 3.00:1 20.00 <br />Pond Results: <br />Peak Elevation: 7,387.07 <br />H'graph Detention Tme: 0.51 hrs <br />Dewacer Tme: 0.61 days <br />Trap Efficiency: 66.80 % i <br />Dewatering time is ca/cu/aced from peak stage to lowest spillway <br />Elevation-Capacity-Discharge Table <br />• <br />Riser Riser Height ~ Barrel garret Barrel Slope <br />Oi (me)ter (k) I D~ (m~ter Length (R) (%) ~ Manning's n Spillway E1ev <br />30.00 5.00 24.00 120.00 10.00 0.0240 7,385.00 <br />Structure Detail: <br />"Sediment capaaty based on Average Annual R of 30.0 for Y year(s) <br />Drop Inlet <br /> <br />Elevation Area <br /> <br />(ac) Capacity <br /> <br />(ac-k) Discharge <br /> <br />(cfs) Dewacer <br />Time <br />(hrs) <br />7,378.87 0.599 0.000 0.000 Top of Sed. Storage <br />7,379.00 0.604 0.081 0.000 <br />7,380.00 0.640 D.703 0.000 <br />7,381.00 0.678 1.362 0.000 <br />7,382.00 0.717 2.059 0.000 <br />7,383.00 0.757 2.796 0.000 <br />Filename: pt4asc4 Printed 02-26-t999 <br />