My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE132017
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE132017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:47 PM
Creation date
11/25/2007 11:47:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981044
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 44 Subsidence Monitoring
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• SUBSIDENCE MONITORING PLAN <br />E-SEAM LONGWALL PANELS 1 EAST AND 2 EAST <br />This Subsidence Monitoring Plan (Plan) outlines the monitoring <br />program to be followed for the 1 East and 2 East longwall panels <br />in the E-seam. This Plan is designed to verify the subsidence <br />predictions for draw angle and maximum subsidence contained the <br />Permit for the No. 6 Mine longwall panels. <br />1.0 Monitoring Points <br />This Plan utilizes both existing and new monitoring points. Not <br />all of the existing monitoring points will be monitored under this <br />Plan. Figure 1 illustrates the locations of existing subsidence <br />monitoring points with respect to No. 5 Mine workings (F-seam) and <br />No. 6 Mine workings (E-seam). Figure 1 also shows generalized <br />overburden thickness contours for No. 6 Mine. <br />A projected zero-subsidence contour was used to determine which <br />monuments would be monitored under this Plan for mining of 1 East <br />and 2 East longwall panels. This projected zero-subsidence contour <br />is shown on Figure 1. It is based on the anticipated 19 degree <br />draw angle plus a 6 degree buffer factor. Cyprus Empire will <br />monitor parts of existing lines "A", "B", "C", "D", "S", and "T". <br />Specific points to be monitored are listed in Section 2.0, <br />• Monitoring Schedule, of this Plan. <br />New monuments will be constructed to extend monitoring line "B". <br />These new monuments will be constructed on 50-ft centers along the <br />orientations shown on Figure i. Monument construction will conform <br />to the requirements and specifications contained in the Permit. <br />2.0 Monitoring Schedule <br />It is the intent of Cyprus Empire to provide monitoring under this <br />Plan of potentially affected monuments on a quarterly basis. <br />However, this monitoring schedule will be modified as necessary to <br />accomodate weather conditions. <br />Monitoring of any given point will continue until two successive <br />surveys indicate subsidence has ceased. Monitoring of a point <br />satisfying this criteria will then be discontinued. <br />2.1 Quarterly monitoring, 1 East Longwall <br />(a) Lines "S" and "T", monuments S1 through 517 and <br />T1 and T2. Monitoring to commence no later than <br />when the longwall face is 800 ft from <br />monument T2. <br />• (b) Line "C", monuments C1 through C13. Monitoring <br />to commence no later than when the longwall face <br />is 630 ft from monument C13. <br />Ex 44-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.