Laserfiche WebLink
~- <br />Doc Date:1 211 112 0 01 <br />• SI~ 4.13 CONTEMPORANEOUS RECLAMATION IIIIIIIIIiIIlllllll <br />All reclamation activities including, but not 1lmited to those associated <br />with progressive disturbance of the permanent coal refuse stockpile and <br />final reclamation of mine disturbance areas will be completed as <br />contemporaneously as possible. Reclamation activities will include <br />removal of mine structures, backfilling, grading, topsoil replacement, <br />revegetation and post reclamation management. Implementation of <br />reclamation plans as described in Section 2.05.4, Reclamation Plan, will <br />assure that each step in the reclamation process is completed in an <br />effective and timely manner. <br />It should be noted, that for areas of ongoing surface disturbance, <br />contemporaneous reclamation serves to stabilize disturbance areas, <br />minimize erosion, and prevent adverse surface water impacts as these <br />impacts occur. <br />• <br /> <br />4.13-1 <br />