Laserfiche WebLink
E%HIBIT L <br />RECLAHATIOH COSTS <br />The Table of Disturbance in Exhibit D and this Exhibit have <br />selected a point in the mining where disturbance is maximized. <br />This point is at the beginning of mining in Phase 1 where the pit <br />involves backfilling of four walls. <br />Maior Disturbance <br />Cost/ <br />Amount Units Unit <br />I I I <br />I I I <br />I I 1 <br />I I I <br />~ I 1 <br />Cost <br />1. Backfill slopes of 8 acre <br />mining area from over- <br />burden stockpile 1:1 to <br />3:1 and 2: 1, 4 faces at <br />2,400 L.F. 138,489 I CY 1$ .80 1$30,791.20 <br />I I I I <br />2. Place and compact clay i 1 <br />core, 2,400 L.F. 117,333 ~ CY <br />I I <br />3. Scarify overburden stock- 1 I <br />pile area, 3 acres 114,520 1 SY <br />I I <br />4. Spread topsoil at 6" to I 1 <br />10" stripped area-3 acres.) I <br />Setback and slope-1.6 1 <br />acres ( 7,891 I CY <br />I I <br />5. Seeding, fertilize, mulch 1 I <br />7.6 acres 1 7.6 1 AC <br />I I <br />I I <br />SUBTOTAL <br />I I <br />1$ 1.25 1$21,666.25 <br />I I <br />1 I <br />I$ .15 1$ 2,178.00 <br />I I <br />I I <br />I I <br />I I <br />1$ .801$ 6,312.80 <br />1$500.00 1$ 3,800.00 <br />I I <br />I I <br />$64,748.25 <br />L-1 <br />