Laserfiche WebLink
Page 4 <br />10> The South Platte River-runs along the west side of this <br />property. Some of the property may be west of the south <br />Platte River and if so, the river would run along the east <br />side of that land. Some river bank erosion has occurred. <br />Streambank protection may be needed and it should start at a <br />stabilized or controlled point. Streambank protection <br />should start at a depth well below the anticipated lowest <br />depth of river bottom scouring. A berm between the river <br />and pits where gravel material is removed should be built <br />and it should be wide and high enough to prevent the bank <br />from cutting by overtopping during a flood. Vegetative <br />protection should be considered on the berm and upper parts <br />of the river bank. The channel capacity of the river should <br />also be maintained. A 404 permit will need to be obtained <br />from the Corps of Army Engineers for any river bank work. <br />If we can be of any additional assistance, please feel free <br />to contact this office. <br />Sin rely, _ <br />~~ ~ ~. <br />Roy Bell <br />District Conservationist <br />attachments: Mulching Standards and Specifications <br />Soil Descriptions for: <br />3 - Aquolls and Aquents, gravelly substratum <br />10 - Bankard sandy loam, 0 to 3 percent slopes <br />