My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131989
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:46 PM
Creation date
11/25/2007 11:44:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989120
IBM Index Class Name
Permit File
Doc Date
10/6/2003
Doc Name
Application
From
C&M Concrete Companies
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b) Enhancement of wildlife habitat is expected upon reclamation <br />at this site. Existing wildlife habitat is not anticipated <br />to be greatly affected during the mining operation because <br />riverbank wetland areas will not be disturbed. <br />6.4 Topsoilina <br />a) Overburden and topsoil will be scraped, stockpiled, and <br />seeded if -left more. than one growing season. <br />b) Existing trees on the site along the South Platte River will <br />be undisturbed. <br />c) The stockpiles will be placed just outside the pit area. <br />The area of the stockpiles has been considered in the <br />calculation of affected area. <br />d) The final surface will be graded to insure stability of the <br />pit side slopes. <br />e) The existing overburden and topsoil are an adequate growth <br />medium with fertilizer. <br />f) Soil amendments will be added as deemed necessary. <br />g) No vegetation piles are anticipated. <br />6.5 Revegetation <br />a) Reveqetation with native species is a part of the <br />reclamation plan. <br />b) No portion of this area will be reclaimed as forest land. <br />c) The choice of reclamation for this site is water storage. <br />The slopes will be 3:1 maximum, gentle enough for livestock <br />and wildlife to traverse. Seeding will be done by either <br />broadcasting or drilling. <br />d) Environmental factors have been considered in the chosen <br />reclamation plan. Slopes will be adequately stabilized by <br />compaction during the grading operation. Further surface <br />stability will be provided by the vegetation as it becomes <br />established. <br />E-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.