My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131983
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:46 PM
Creation date
11/25/2007 11:44:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
As-Built Report Sedimentation Structure Pond 005
Section_Exhibit Name
Tab 13 Attachment 13-3C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 13-3C-11 <br />As-Built Storage Capacity Summery <br />Pond 005 <br />Capacity <br />Elevation Stage (At.-Ft J Description <br /> .. <br />~ <br />6857.0 0 0.00 Excavetion <br />Bottom df ~POnd <br />6864.4 7.4 2.5 100X Sediment S[o rage <br />6872.2 15.2 8.3 Elevation of Principal Spillway <br />6873.0 16.0 9.1 10-Yr, 24-Xr. Peak Stage <br />6874.1 17.1 10.2 Crest of Emergency Spillway <br />6875.4 18.4 11.5 25-Yr., 24-Rr. Peak Stage <br />6875.7 18.7 11.9 100-Yr., 24-Rr. Peak Stage <br />6879.6 22.6 16.9 Top of Embankment <br />Peabody does not anticipate any other inflow to the pond at this time. The principal <br />spillway will be noncLogging and will automatically dewater the ponding area to maintain <br />the design capacity for the runoff volume for a 10-year, 24-hour storm event. Any <br />additional dewatering required will be done by transporting the water to another pond for <br />treatment, or discharging the water by utilizing the 4-inch PVC dewater pipe in accordance <br />with the approved Colorado NPDES permit. <br />SDIIlwHYS <br />This sediment pond has two separate spillways; a principal and an emergency. Please see <br />Exhibit 13•SA for location of spi llweys. The principal spillway consists of a 24-inch <br />diameter drop inlet corrugated metal pipe (CNP) with a trash rack at the inlet. This pipe <br />wil( keep the pond level et the E872.2 elevation. Maximum estimated elevation (peak <br />stage) above the principal spillway with the passage et the 10-year, 24-hour event will be <br />6873.0, this leaves 1.1 feet [o the emergency spillway (elevation 6874.1). <br />The embankment portion of the emergency spillway consists of a trapezoidal channel as <br />shown on Exhibit 13-SA. Assuming the principal spillway was plugged, the trapezoidal <br />channel could safely pass the runoff volume from the 25-year and 100-year, 24-hour storm. <br />The emergency spillway outflow channel consists of a riprepped trapezoidal channel (see <br />Addendum D for specifications). Peek estimated stage elevation with the passage of the <br />100-year storm is 6875.7. This leaves 3.9 feet of freeboard to the top of embankment. <br />13-3-12 Revised 08/11/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.