Laserfiche WebLink
-3- <br />6) a) Pursuant to 34-32.5-I 18(5) of the Act, the Board has a right of entry to reclaim the <br />lands affected by the operation, or to respond to an emergency as defined by C.R.S. 34-32.5-121(2) <br />determined: <br />b) The Board will enter the lands to perform reclamation only if the Board has <br />i. that reclamation required by law to have been performed upon such ]ands <br />has not been performed, and <br />ii. that financial warranty forfeiture proceedings described in the Act or <br />similar provisions of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond to an emergency <br />only where Che Division determines that any of the conditions of Construction Material Rule 8.4.2. exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />!_! a) Rider is attached. <br />1 XX ! b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />RONALD W. CATTANY <br />Division Director <br />M:bsaV3DC1TEMP~M-AP-28_M2002068_ESC_20021028_7204A5 PM.doc <br />