Laserfiche WebLink
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.water.state.co.us <br />y~eoe~co~a <br />RECEIVED ~ <br />JUL 1 5 2005 ~"•`* <br />Division ~f Minerals and Geolagy <br />Response to Reclamation Permit Application Consideration <br />DATE: July I5, 2005 <br />TO: Erica S Crosby, Environmental Protection Specialist <br />CC: Division 2 Office; Dis 'ct 11 Water Commissioner <br />FROM: Don West, P.E. <br />RE: River Park Recreation Access, File No. M-2005-051 <br />Operator: ACA Products, Inc. <br />Contact: Gary Cambell 719/395-3790 <br />Section 27, Twp 14S, Rng 78W, 6th P.M., Chaffee County <br />Bill Owens <br />Governor <br />Russell George <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of Bound <br />water must not occur during or after mining operations. If stormwater is containec! on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hottrs, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other::. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a grave] pit <br />or other type of well permit, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit azea. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS: <br /> <br />