Laserfiche WebLink
i <br />r <br />• <br />_'~_ <br />• <br />5. Recalculation of reclamation costs <br />a. ',Saximum movement of topsoil or overburden during any one phase. Tiiis is <br />calculated ona 50 acre floating bond program. <br />5~ A. :: 1' topsoil :: $. 35/cy $25,227.50 <br />The following items are computed on 20 acres of moderate and minor dist- <br />urbance caith .073 A. per surface acre to be reclaimed or 1.46 A. <br />b. Soil preparation <br />1.46 A R $10.00 <br />c. Fertilizer <br />Ammonium nitrate <br />Super phosphate <br />d. Seeding costs <br />Grass seeding as <br />1.46A a 7.5'/A <br />Planting costs <br />1.46 n `: $7.50/A <br />200''/A ': 1.4fi :; $.10/ ;' <br />100;`/A \ 1.46 :: $. 15/ 'F <br />per reclamation plan <br />?LS :i $2.50/; <br />Total <br />14.60 <br />20.15 <br />21.90 <br />27.33 <br />10.95 <br />$2Z;, 322.43 <br />Average cost/A on 50 acres $566.45 <br />I think this should provide the answers you requested. As you know, this <br />is an operator who prefers to be in complete compliance. <br />Cordially <br />Lloy "Buck" Barnhart <br />Consultant/Quillen Compaany <br />cc: Bob Quillen <br />