My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131841
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131841
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:38 PM
Creation date
11/25/2007 11:35:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Section_Exhibit Name
Tab 20 Backfilling and Grading
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 20-1 <br />PO STMINING LANDFO RM MASS BALANCE <br />Premin in9 Pit Material Volume Calculations <br />Premining Material Volume 49,694,919 cy <br />Virgin Overburden Material Volume 9,073,200 cy <br />Total In-place Coal Volume 9,621,719 cy <br />Recoverable Coal Volume 9,010,123 cy <br />Non-recovered Coal and Parting Material Volume 11,596 cy <br />Premining Overburden Volume 40,684,796 cy <br />Total Pit Spoil Volume 46,909,570 cy <br />Premining Material Mass Volume <br />Total Pit Spoil Volume =46,909,570 cy <br />Total Premining Material Volume =49,694,919 cy <br />Volume to Achieve Premining Original Ground Surface =2,785,349 cy <br />% Difference = -5.6% <br />Average Elevation Change of Disturbed Lands =-3.7 ft. <br />Postmining Material Volume Calculations <br />Postmining Spoil Material Calculated: <br />Postmining Spoil Material Volume Ilnternall 46,878,503 cy <br />Postmining Spoil Material Volume (External) 348,505 cy <br />Total Postmining Spoil Volume 7,227,008 cy <br />Postmining Overburden Material Excavated <br />Premining Total Pit Spoil Volume 46,909,570 cy <br />Postmining Overburden Material (External) 1,627,342 cv <br />Total Overburden Material Excavated (Swelled) 48,536,912 cy <br />Postmining Material Volume Comparison <br />Total Postmining Spoil Volume 47,227,008 cy <br />Total Overburden Material Excavated 48,536,912 cy <br />Volume Difference 1,309,904 cy <br />Difference = -2.7% <br />6 Revised 9/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.