Laserfiche WebLink
interpretation information for the remaining undisturbed areas ui thin the study area. • <br />The prime farmland assessment and request for negative determination required by CDMG <br />regulation 2.04.12, is included in Attachment 9-3. Topsoil fertility date for samples <br />collected from the stockpiles inside the railroad loop is presented in Attachment 9-4. <br />Topsoil handling plans, including salvage, stockpiling, and redistribution, are includec <br />rithin Tab 79 of this permit document. <br />• <br /> <br />2 <br />