Laserfiche WebLink
Colorado Divie ion of Minerals and Geology <br />_________________________________________ <br />ESTIMATING FORM - SCRAPER WORK <br />TASK NO. 2 PREP. BY: GSC PEAMIT N0. M-96-052 <br />__________ ________ <br />DATE 07/08/97 FILENAME: M0E2-2 <br />_ __________ <br />MINE: Del Camino <br />Pit <br />_________ ________ <br />PERMIT ACTION Bond Evaluation ____________ ___________ <br />TASK DESCRIPTION Replace topsoil ~ NUVC F/0µl ,~7V[~`J/~C 70 Sod GS <br />HOURLY EQUIPMENT COSTS: <br />_______- - Single, Double or Triple <br />County: WELD Labor Zone 1 Shifts S <br />___________ <br />Equipment ________ _ <br />Descriptions _________ <br />Scraper team make-up CA7 61St wich RO PS cab <br />________________________________ <br />___________ <br />Road mains. - Grader N/A <br />- Water T.: N/A <br />__________ <br />Scraper Team _________________________________ <br />Road Maintenance <br />Scraper Dozer (sI Grader Water truck <br />Equipment Filename:616C-ROP 0 N/A N/A <br />________ ________ <br />Utilization on lob: 100t N/A _________ <br />N/A _________ <br />N/A <br />Cost Breakdown <br />Ownership cost/hr: $28.12 N/A N/A N/A <br />Operating cost/h r: $50.95 N/A N/A N/A <br />Operator cost/hr: $23.13 N/A N/A N/A <br />Unit subtotals: 5102.21 N/A N/A N/A <br />Scraper team subtotal $102.21 Ma int. subtotal N/A <br /> <br />Total Work Team _ <br />Cost/Hr: _________ <br />$102.21 _________ <br />MATERIAL QUANTITIES: <br />Beg. <br />Volume: 16133 CCY <br />Cu. Yd. ---------- Svell Loose <br />Volume: 16,133 CCY Factor: 1.125 Volume: 19,150 LCY <br />__________ __________ _____________ <br />Source of quantity cake-off: permit app <br />___________________________________________ <br />Source of est. swell factor: program <br />___________________________________________ <br />