Laserfiche WebLink
RECLAMATION COST SUNPIMY cont'd sheet 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cos[ I$) <br />Subtotal fH): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Taek No.~ Task Des criptton ~ Cos[ ($) <br />Subtotal (I): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />1 ~ Replace Overburden - BOfifi6 cu. yds. <br />2 ~ Move Topsoil to Slopes - 16133 cu. yds. <br />3 ~ Spread topsoil over slopes - 16133 cu. }•ds <br />_____________________________________________________ <br />Cost ($) <br />522,999 <br />56,850 <br />$1,310 <br />Subtotal (J): 531,104 <br />