Laserfiche WebLink
ROADABLE EQUI PMEN7: sheet 2 of 2 <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description Cost/hr (no. hauled) Cost/hr Cost/hr <br />Subtotals $0.00 •$0 00 <br />MOB/DEMOB SUPPORT EQUIPMENT: _________ _________ <br />--------------------------- Weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description ICOns) Cos C/hr Cost/hr (no. hauled Cost/hr Coe t/hr Cost/ea <br /> Subtotals $0.00 50.00 50 00 <br /> <br />Total Eqp. <br />Fleet Size _________ <br />Haul Trip _________ _________ <br />Return Trrp <br />Roadable Eqp. Descript ron Cast/hr ono. hauled) Cost/hr Cost/hr <br />Pilot Car $28.1] 2 $56.39 $56.39 <br />Sub cola is <br />556.34 $96.J4 <br />EQUIPMENT HAUL DISTANCE 6 TIME <br />Nearest major city or town within project area region: Greeley <br />_______________________________________________________ <br />Total one way [ravel distance = 30.0 miles. Average travel speed 40.00 mph. <br />______ _____________ <br />Job Time - Non Roadable Equip.= hours load Roatla ble Equip.= N/A hours load <br />0.76 hours haul 0.75 hours haul <br />hours unload N/A hours unload <br />0.]S hours return 0.]5 hours return <br />SOB COST Total Mob/Demob CosC = $1,262.39 <br />_________ _____________ <br />_________ _____________ <br />NOTE: Non-roadable equipment (haul rig required [o transport) mob/demob costs based on 2 round trips, each trip <br />consist rng of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equ ipme n[ on certain <br />specified road segments within the S[a[e. Separate permits are requ rred for each rig on each loaded trrp. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equipment which must be <br />partially dismantled for transport and re-assembled at the job site. Costs for li Eting equ ipmenc and other <br />support equipment needed for this work should be included in the mob/demob costs. <br />