Laserfiche WebLink
<br /> <br />Mr. Bob Freitag <br />Page -2- <br />other pita~not previously identified for topsoil salvage) such <br />topsoil will be saved (aad stabilized) for reclamation purposes. <br />2. All final graded elopes will be no greater than 2:1 (h:v) (Rule <br />6.1), with the exception that slopes of the Ansley Flat Pit, <br />as stated in your plan, will be no steeper than 3:1. <br />3. The appropriate diversion and sediment catching structures, as <br />recommended by the Soil Conservation Service for the P.oberts <br />Tunnel, A. L. Hill and Valley of the Sun Pits will be constructed <br />before summer 1981. <br />4. If plena for a recreational area (ball paric) For the Noodaidc Pit <br />are changed, the site will be reclaimed by grading, and reveEetation <br />(as per Soil Conservation Service recommendations), unless an <br />alternate reclamation or land use plan ie developed, at which <br />time we are to be informed. Reclamation of this site is to be <br />carried to completion within 5 years (Rule G) fros the date of <br />Chia letter. <br />S. The Valley of the Sun Pit may require an Army Corps of &ngineers <br />404 permit. I suggest you call tl~e Resident E~:gineer in Littleton <br />for more information. <br />We will be happy to consult with you when it is time for reclamation of <br />these pits. <br />Sincerely, <br /> <br />Mike Stanton <br />Reclamation Specialist <br />HS:pa <br />