Laserfiche WebLink
TOC - 6 <br />LIST OF TABLES <br /> 2.1-1 Equipment List <br /> 2.2-1 Construction And Disturbance Timing <br /> 2.2-3 Stability Analysis -Line 1 At Station 103+00 <br /> 2.2~ Stability Analysis -Line 2 At Station 97+00 <br /> 2.2-5 Stability Analysis -Line 3 At Station 90+00 <br /> 2.5.1 Surface And Ground Water Monitoring <br /> 2.5-2 Water Quality Monitoring <br /> 2.5-3 Flow Rating Charts Munger Canyon <br /> 3.3-1 Depths Of Suitable Topsoil Material Available <br /> 3.3-2 Volumes Of Material To Be Salvaged Along Road Alignment <br /> 3.3-3 Volumes Of Material To Be Salvaged In The Waste Rock Disposal Area <br /> 3.3-4 Chemical Analysis Of Surface Layer At Mine Site <br /> 3.4-1a Juniper Woodland Seed Mixture <br />• 3.4-1b Big Sagebrush Shtubland Seed Mixture <br /> 3.4-Ic Greasewood Shrubland Seed Mixture <br /> 3.7-1 Reclamation Costs <br /> 3.7-2 Reclamation Timetable <br /> 3.9-I Reclamation Costs For Prelaw Disturbance <br /> 3.9-2 Calculation Of Earthwork Volumes For Reclamation Of Prelaw Disturbance <br /> 3.9-3 Hydrology Calculations For Reclamation Of Prelaw Disturbance <br /> 3.9j3 Stability Analysis For Reclamation Of Prelaw Disturbance <br /> 3.9-5 Culvert Removal And Stream Channel Reconstruction <br /> 4.1-1 Test Pit T P 1 <br /> 4.1-2 Test Pit T P 2 <br /> 4.1-3 Test Pit T P 3 <br /> 4.1-4 Test Pit T P 4 <br /> 4.1-5 Test Pit T P 5 <br /> 4.2-1 Core Laboratories Analytical Report -Roof And Floor <br /> 4.2-2 Drill Hole Information Summary <br />M" Volume I lhi~nal Permit l2 - 18 - 96 <br />