My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131659
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:28 PM
Creation date
11/25/2007 11:26:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Permit File
Doc Name
CONSTRUCTION MATERIALS RULE 6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ .,~ ~;~ <br />q 'tiO~1^ e,~3 " Construction Materials Rule 6 8' _Q,.~`f <br />aa~~jj <br />0~ c A description of how the Reclamation Plan will be'~j~ ~ <br />JyL._ _~ ~,~o. implem nted to meet each applicable requirement of Section 3.1; ~"~ <br />~~ <br />~~ <br />a~ <br />(d) Where applicable, plans for topsoil segregation, <br />preservation, and replacement; for stabilization, compaction, and <br />grading of spoil; and for revegetation. The revegetation plan shall <br />contain a list of the preferred species of grass, legumes, forbs, <br />shrubs or trees to be planted, the method and rates of seeding and <br />planting, the estimated availability of viable seeds in sufficient <br />quantities of the species proposed to be used, and the proposed time <br />~of seeding and planting; <br />(e) A plan or schedule indicating how and when <br />reclamation will be implemented. Such plan or schedule shall not <br />be tied to any specific date but shall be tied to implementation or <br />completion of different stages of the mining operation as described <br />in Subparagraph 6.4.4(1)(e). The plan or schedule shall include: <br />(i) An estimate of the periods of time which will <br />be required for the various stages or phases of rechunation; <br />(ii) A description of the size and location of each <br />area to be reclaimed during each phase; and <br />(iii) An outline of the sequence in which each stage <br />or phase of reclamation will be carried out. <br />(The schedule need not be separate and distinct from the <br />Reclamation Plan, but may be incorporated therein.) <br />(f) A description of each of the following: <br /> <br />¢~ <br />~~° <br />(i) Final grading -specify maximum anticipated <br />slope gradient or expected ranges thereof; <br />(ii) Seeding -specify types, mixtures, quantities, <br />and expected time(s) of seeding and planting; <br />j~10,",Y~.~m) Fertilization - if applicable, specify types, <br />inixt~s, quantities and time of application; <br />(iv) Revegetation -specify types of trees, shrubs, <br />y~c., quantities, size and location; and <br />(v) Topsoiling -specify anticipated minimum <br />depth or range of depths for those s re opsoil will <br />'-° -placed. <br />- ^~^~~ gib . <br />4 0 <br />y , a, <br />4 /o i <br />.a <br />~~,CS <br />D•~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.