My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131659
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131659
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:28 PM
Creation date
11/25/2007 11:26:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1998013
IBM Index Class Name
Permit File
Doc Name
CONSTRUCTION MATERIALS RULE 6
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 107 <br />Construction Materials Rule 6 <br />(g) Show the owner's name, type of structures, and <br />location of all permanent or man-made structures contained on the <br />area of affected land and within two hundred (200) feet of the <br />affected land. <br />(h) In conjunction with Exhibit I -Soils Information, <br />Subsection 6.4.9, soils information may be presented on a map in <br />this section; <br />(i) Aerial photos, if available, may be included in this <br />- -- section. <br />6.4.4 E7~TT D -Mining Plan <br />The mining plan shall supply the following information, correlated with the <br />affected lands, map(s) and timetables: <br />(a) description of the method(s) of mining to be employed in <br />each stage of the operation as related to any surface disturbance on affected <br />lands; <br />(b) earthmoving; <br />B~l a'~~' ~ ~~"Lr'~ (c) all water diversions and impoundments; and ~3a ~„~~ 1 <br />~,~/o ~~ (d) the size of area(s) to be worked at any one time. a~-^n~ ~B"°`" <br />~/ (e) An approximate timetable to describe the mining operation. <br />The timetable is for the purpose of establishing the relationship between <br />mining and reclamation during the different phases of a mining operation. <br />An Operator/Applicant shall not be required to meet specific dates for <br />_ initiation, or completion of mining in a phase as may be identified in the <br />etable. This does not exempt an Operator/Applicant from complying <br />-~ ~ th the performance standards of Section 3.1. Such timetable should <br />^ ~ z ~ ~^ ` ~clude: <br />n,,,,n~w •.~^'"- (r) an estrmate or the penons or trme wmcn wru <br />~"'~ . „ ,,:.~ be required for the various stages or phases of the operation; <br />(ii) a description of the size and location of each <br />J~,, ~ (ov0 ~~ area to be worked during each phase; and <br />/o~ / <br />a (iii) outlining the sequence in which each stage or <br />~ ~°' "' ~ _.%~~ phase of the operation will be carried out. <br />(T'imetables need not be separate and distinct from the mining plan, <br />but may be incorporated therein.) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.