Laserfiche WebLink
c _ <br />~ - Associates <br />March 13a', 2001 <br />Mr, Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 5: Marco 4 through March 10, 2001 <br />Cressou Project Phase IVa, Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase IVa Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of Mazch 4~' <br />• through Mazch 10`x, 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 10° F to 27° F, with highs ranging from 36° F to 50° F. Snow was recorded on Mazch 6~' <br />and March l0a'. Weather observations were made on the six days worked of this seven-day reporting <br />period. <br />Construction Svnoasis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa <br />construction. Ames conducted no Phase Na construction activities during this seven-day reporting <br />period. <br />Field Monitorine and Testing Activities <br />No construction activities to observe. <br />Laboratory Test Results <br />No laboratory testing was conducted. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />