Laserfiche WebLink
~ Associ~2-.tes <br />May 29`s, 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 16: May 20 through May 26, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of May 20~' <br />through May 26s', 2001. <br />The weather during this reporting period was clear to partly cloudy. Approximate daytime low <br />temperatures ranged from 20° F to 45° F, with highs ranging from 60° F to 73°. Light snow was <br />recorded overnight on May 215. Weather observations were made on the five days worked of this <br />seven-day reporting period. <br />Construction Svnopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase Na construction activities on three days (May 21st through May <br />23`d) of this seven-day reporting period. <br />Ames continued Phase Na construction activities by conducting clearing and grubbing within the Phase <br />Na azea. Ames continued to haul topsoil from the Phase Na area and hauled it to a designated <br />stockpile location near the proposed Highway 67 and resumed clearing above the existing HWY 67. <br />General locations of construction activities are shown on the sketch presented in Attachment A. <br />Field Monitoring and Testing Activities <br />Golder observed clearing of the Phase Na azea and noted that the activities conducted were within <br />the disturbance limits. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />