My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131579
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131579
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:24 PM
Creation date
11/25/2007 11:19:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - A~soci~ates <br />February 20~', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />12E: Weekly Summary No. 2: February 11 through February 17, 2001 <br />Cresson Project Phase IVa, Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na Constmction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of February l lc' <br />through February 17~', 2001. <br />• The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 2° F to 12° F, with highs ranging from 33° F to 43° F. Snow was recorded on February <br />14s'. Weather observations were made on six days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na <br />construction. Ames conducted Phase IVa construction activities on one day of this seven-day reporting <br />period. <br />Ames completed remediation of the well in Upper Arequa Gulch by filling the casing with concrete. <br />Field Monitoring and Testing Activities <br />Golder observed remediation of the Arequa Gulch well and sampled concrete placed. <br />Laboratory Test Results <br />No laboratory testing was conducted during this reporting period. <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.