My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131517
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:20 PM
Creation date
11/25/2007 11:16:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 20 PERMIT REVISION DURING THIRD FIVE-YEAR PERMIT TERM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Additionally, please remember (as explained in the T.R., Item <br />5) that the purpose of building the Section 16 Pond is to <br />reduce the volume of water flow impacting the entire <br />diversion, and this impoundment is the reason for the 0.00 cfs <br />found at the natural drainage segments. <br />The outer berm of the South Collection Ditch is capable of <br />containing runoff flow contributed by Colowyo activities at <br />the junction where the final East Pit Ditch intersects the <br />South Collection Ditch as demonstrated in the SEDCAD run and <br />certified Typical Cross Section - South Collection Ditch <br />drawing found in T.R. 30. The SEDCAD run shows that flow at <br />this intersection is 6.68 cfs with triangular ditch dimensions <br />of 0.85 feet deep, 6.8 feet wide. The typical cross section <br />gives a minimum flow capacity of 25.49 cfs with minimum <br />triangular ditch dimensions of 1.3 feet deep, 10.4 feet wide. <br />The Colowyo actual as-built ditch at this location can handle <br />a minimum of 122 cfs with minimum triangular ditch dimensions <br />of 1.8 feet deep, 14.4 feet wide. Therefore, since the as- <br />built flow capacity of the south collection ditch is more than <br />1,800% larger than the expected flow contribution from Colowyo <br />activities in the Final East Pit Ditch, no problems should <br />occur. <br />Division's Cost Estimate, Section 16 Pond/Ditch <br />• Colowyo agrees with the Division's calculated cost of $523.00 <br />dollars which is covered by the contingency held in the current <br />Colowyo bond. Colowyo would like to wait until the permit mid-term <br />review and then formally add this item to the permit. <br />Thank you for your attention in this matter, please call <br />should any questions arise. <br />Sincerely, <br />C/~i/ /fj(L'r/~ <br />Juan Garcia <br />Hydrologist/Environmental <br />Engineer <br />btb <br />Enclosures <br />xc: Moffat County Clerk <br />R. G. Atkinson (w/o enclosures) <br />Central Files <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.