Laserfiche WebLink
REVISID :SEPTEMBER 3, 1993 <br /> COLOWYOCOALCOMPANV <br /> TECHNICAL REVISION, JULY 18, 1993 <br /> PERMIT BOND CALCULATIONS <br />• FACIUTIl3 REMOVAL COSTS <br /> (1) (~ (3) <br /> Material Cast/ Coat Fa <br />Feciltiea Volume UnB Volume Removal <br />WILSON POND AREA <br />Wilson Pond Pump $MtiOn <br />No changes <br />ADMINISTRATNE AREA <br />Guard Shack <br />No changes <br />Adminetration Buildirg <br />No changes <br />TAYLOR CREEK AREA <br />Taylor Creak Pump SMtion <br />No changes <br />MINE MAINT@tANCEARFA <br />Production Once and IabreMry <br />No changes <br />Admin'abatiw Sarvicea Office Buildirg <br />No changes <br />Truck Repair Shop and Warehoum Faciltias <br />Additional Current and Propomd Faciities <br />Stmt Structured Shop Building <br />Subtotal Net Change Demoltion Cost <br />Warehorca Verd Facilties <br />Additional Current end Propomd Facif6es <br />Steel Structured Battery Building <br />• Sudace Oil Tenk # 1A - 8,000 gallons (1992) <br />Sudace Oil Tank # 2A - 8,000 gallors (1992) <br />Surface Oif Tenk # 4A - 8,000 gallons (1992) <br />Surface Oil Tenk # 8 - 6,000 gallons (1992) <br />Sudace Oil Tenk # 9 - 4,000 gallons (1992) <br />Surface Oil Tenk # 10 -500 gallons (1992) <br />Surlaca Oil Tenk # 11 -500 gallons (1992) <br />Sudace Oil Tank # 12 - 150 gallons (1992) <br />Sludge Removal Associated w/Sudace Tanks <br />Steel Structured Oil Handling Building <br />Concrete Structures Associated w/Oil Handling Building <br />SubtoMl Net Charge Demoltion Cost <br />Dozer and Bucket Repair Shop <br />No changes <br />Dozer Shop Vard Facilities <br />Addaiorsl Currant end Proposed Fecifties <br />No changm <br />Faciliias Moved to Anoher Location <br />Unlmded Fuel Tank #8 - 10,000 gellors <br />Unlmded Fuel Tank #7 - 8.000 gallons <br />Diesel Fuel Tank #5 - 10,000 gallors <br />Dieml Fuel Tank #6 - 10,000 gallore <br />Sludge Removal Associated w/Sudace Tanks <br />SuMoMI Ne[ Change Demoliion Cost <br />Wash Bay Area <br />Additio~l Current end Propomd Facilties <br />Stmt Struduretl Addition (additional building) <br />Concrete Structures Associated w/addiRional bulldog <br />Water Taric # 4 - 25,000 gellore <br />ConcreM Structures Associated w/Ponds <br />Steel Structured Pump Houm <br />Concrete Structures Associated w/Pump Houm <br />• SubtoMl Net Change OemolXion Cos[ <br />(4) <br />Remarks <br />No Charges Were Made To These Faciltien <br />No Changes Were Made To These Facilnm <br />No Changes Were Made To Thaw Facilaes <br />No Charges Ware Made To These Facilaea <br />No Charges Were Made Ta These Faciliies <br />No Charges Wera Made To Thom Facilam <br />6,075 0.17 1,033 Additional Tool Storage <br />1,1133 <br />960 0.17 163 Another, larger Building was purchamd <br />847 0.17 144 Additional Mnk was purchamd <br />847 0.17 144 AddNOnal tank was purchamd <br />847 0.17 144 Additional Mnkwas pumhemd <br />624 0.17 108 Additional Mnk was purchamd <br />423 0.17 72 Add'nionel Mnk was purchamd <br />54 0.17 9 Additiond Mnk was purclvamd <br />54 0.17 9 Additional Mnkwas purchased <br />16 0.17 3 Additional Mnk was purchamd <br />703 1.60 1,125 Additional sludge due to more tank wlume <br />49,400 0.17 8,398 Additional buildng <br />1,474 3.84 5,660 <br />__ Additond concrete for buildirg <br />____ ______ ____ <br />15,977 <br />No Charges Wera Made To Them Faciliies <br />0 0.00 0 <br />1,344 0.17 (228) This Mnkwas mowdto Gosmrd Fecilaes <br />1,077 0.17 (163) This Mnkwas movedto Stoker PMnt Faciliea <br />1,347 0.17 (229) This Mnkwas mowdM Sorts West Fecil6es <br />1,347 0.17 (229) This lank was moved to Souttr West FaciRiea <br />774 <br />___ 1.60 <br />______ (1,236) <br />______ Sludge removal assocM[e0 with Mnka <br />_ (2~1~) <br />19,560 0.17 3,325 Addaiorrel building planned <br />5,131 3.84 19,702 Additioral wncrete for building planrsd <br />3,371 0.17 573 Moved Irom South Wast Feciftiea <br />1,080 3.84 4,147 Additional Weshbey pond concrete structures <br />3,360 0.17 571 Additornal washbay pond pumphoum <br />150 <br />____ 3.84 <br />______ 576 <br />______ Atltlitional washbay pond pumphoum <br /> 26,595 <br />-rtt a ~r 9/l v/ 9 3 <br />