• TECHNICAL REVISION REQIIEST FOR BOND IIPDATE~ WASHBAY POND <br />AND BEDIMENT BITMP~ NEW TOPSOIL STOCKPILE <br />The bond, as submitted in October 1992, has been <br />completely updated to include changes in the mine facilities, <br />additional pond and sediment sump and a new topsoil stockpile #15K <br />for the West Pit Sediment Pond. Changes to the mine facilities and <br />proposed facilities, shown in October 1992, have been updated to <br />include all new construction, and 1993 proposed construction (see <br />attached schedule) and corresponding changes have been made to Map <br />38, Bond Calculation Map - Facilities Removal and Regrade. An <br />additional pond and sediment sump are being added and are shown for <br />bond calculation purposes included with the sediment ponds. Anew <br />stockpile has been created for the topsoil removed from the West <br />Pit Pond area. The West Pit Pond has also been included with the <br />East Pit facilities as only the West Pit Pond area will be <br />disturbed in 1993. Additional acreage has been included for water <br />line disturbance from the Wilson pond to Water Tank #1 in the mine <br />facilities area. <br />The new bond amount for the East Pit area will be <br />$13,752,211, including this revision and Minor Revision MR21, <br />Dragline Walkroad. The current bond amount for Colowyo is <br />$14,000,000, thus $247,789 of contingency will remain. <br />During the <br />. Revision and subsequent <br />the unresolved bond co <br />October 1993 bond updat <br />estimate to match thos <br />were discovered to be <br />specific costs), D10N <br />attached following tabl <br />new match numbers for <br />bond update process for this Technical <br />discussions with DMG personnel, several of <br />st differences were discovered. During the <br />e, $83,583 was added to Colowyo~s bond cost <br />e done by DMG. Two of the differing areas <br />in facilities costs (add 2.5g for city <br />dozers for ditch reclamation costs. The <br />es show the appropriate corrections and the <br />the current bond calculations. <br />Included with the update are revised pages 1, 15-25, A13, <br />A21, A22, A23, B72, C31, D1, D2, D4, D5, D12, D13, D14, D16-24. <br />The proposed location of the nondischarging washbay pond <br />and associated sediment sump are shown on Map 12A, Hydrology of <br />Gossard and Mine Maintenance Areas and on Map 38, Bond Calculation <br />Map Facilities Removal and Regrade. Wash water exiting the washbay <br />will continue to flow into the existing concrete sediment sump, <br />then pass on to the proposed earthen sediment sump, and then <br />finally to the proposed nondischarging washbay pond. The pond will <br />function as an open water storage tank much like the Taylor Creek <br />Pond. A high volume water pump with a water horse for loading <br />water trucks will draw water from the washbay pond allowing water <br />re-use for dust suppression on mine haul roads and other related <br />uses. Refer to Map TR-24, Washbay Facilities, for additional <br />detail on the proposed sump and pond. <br />-~-Ra~ 9/~~hs <br />