Laserfiche WebLink
PLAN VIEW OF WATER TREATMENT PLANT EOUIPMENT - SCHWARTZWALDER MINE <br />31x4'HIGH FRP <br />SEPARAN TANK <br />CONTROL ROOM <br />FINE WATER AND <br />RECYCLED SORTING STORAGE AREA <br />PLANT WATER ( SEPARAN, FERRIC SULFATE, BARIUM CHLORIDE, <br />i LIME, CHLORINE AND SPARE PARTS.) <br />8' x4' HIGH FRP <br />FERRIC SULFATE <br />WATER <br />TANK <br />TREATMENT <br />I <br />BUILDING <br />620 GPM <br />(MAXIMUM <br />FLOW ) <br />a4'l <br />CHLORINE <br />9x7' HIGH STEEL <br />6x4� HIGH FRP _ <br />LIME TANK <br />I IIIII IIIII IIIII Illy IIIII � 7hQ <br />20492 <br />DISCHARGE <br />TO <br />POND Permit# p <br />Date: <br />Doc Name — —see Map <br />Origin: <br />FIGURE D -5 <br />