Laserfiche WebLink
Civil Software Design -- SEDCAD+ Ver::ion 3.1 <br />Copyright (C) 1987-1992. Pamela J. Schwab. All. rights reserved. <br />Company Name: GREYSTONE DEVELOPMENT COPISULTANTS <br />Filename: C:\SEDCAD3\CR7\PND4A7 User: bgw <br />Date: 01-30-1996 Time: 12:48:'t2 <br />Exhibit 7 Midterm Review, Pond 4 (bottom elE~vation 83.5) <br />Storm: 2.10 inches, 10 year-24 hour, SCS Type I7: <br />Hydrograph Convolution Interval: 0.1 hr <br />ELEVATION-AREA-CAPACITY-DISCHARGE T~~BLE <br />=====Y--=-=-_=_=__-~_:-- <br />J2, Bl, S1 <br />Pond 4 <br />Drainage Area from J2, B1, S1, SWS(s)1-3: 1.7 acres <br />Total Contributing Drainage Area: 8.6 acres <br />SW#1: Perforated Riser <br />SW#2: Emergency Spillway <br />Elev Stage Area Capacity Discharge <br /> <br />- --- (ft) <br />--- (ac) <br />-- --- (ac-ft) <br />--- --- (cfs) <br />-- -------- <br />-------- <br />--- <br />- <br />- <br /> <br />83.50 <br />0.00 <br />0.24 <br />0.00 - <br />--- <br />-------- <br />--------- <br />83.50 0.00 0.24 0.00 <br />83.66 0.00 0.25 0.04 0.00 Top of Sediment Storage (0 Stage <br />84.00 0.34 0.26 0.09 0.00 <br />84.20 0.54 0.28 0.14 0.00 Low orifice of SW#1 <br />84.50 0.84 0.30 0.23 0.00 <br />85.00 1.34 0.35 0.39 0.00 <br />85.50 1.84 0.40 0.58 0.15 <br />86.00 2.34 0.45 0.79 0.21 <br />86.04 2.38 0.43 0.81 0.23 Peak Stage <br />86.50 2.84 0.45 1.01 0.41 <br />87.00 3.34 0.46 1.24 0.51 <br />87.50 3.84 0.46 1.47 0.59 <br />88.00 4.34 0.47 1.71 0.66 <br />88.50 4.84 0.50 1.95 0.73 <br />89.00 5.34 0.54 2.21 0.78 Stage of SW#1 <br />89.50 5.84 0.58 2.49 5.16 <br />90.00 6.34 0.62 2.79 8.51 Stage of SW#2 <br />90.50 6.84 0.62 3.10 24.76 <br />90.56 6.90 0.63 3.14 26.81 <br />90.66 7.00 0.63 3.21 30.00 <br />90.76 7.10 0.63 3.27 36.32 <br />90.86 7.20 0.63 3.33 44.13 <br />90.96 7.30 0.63 3.39 52.24 <br />91.00 7.34 0.63 3.42 60.91 <br />*****ak*t4*ak**** *ak***** ak***#*****************vk**tk*ak******~k********#*t}**#****~F ~k tk!* <br /> <br />7-94 3 Afay 1996 <br />