My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131239
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:32:04 PM
Creation date
11/25/2007 11:03:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
ENVIRONMENTAL RESOURCES - LAND USE APPENDIX
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT "A" <br />PROJECT DESCRIPTION <br />• 46KV POWERLINE <br />This right-of-way project description is for a 46 KV powerline, <br />CWI anticipates usiny approximately 60 foot high poles spaced at approximately <br />every 400 feet. The line would be constructed in two segments with one angle <br />change, CWI anticipates construction using single poles with a few double (H <br />frame) structures required, Some temporary construction roads may he required <br />to access the pole locations, CWI would disturb as little of the area as possi- <br />ble, Where a trail must be built, CWI would scarify and revegetate that area <br />after use, The construction would use conventional powerline equipment and <br />techniques, Backhoes, trucks, and auger trucks would be used, <br />In total, the 46 KV powerline wilt be approximately 8,000 ft, in Tength and lo- <br />cated on a right-of-way of 50 feet wide. Part of the powerline would cross Cwl <br />property and the right-of-way would he separated into two distinct sections. <br />Approximately 6,000 feet of the powerline would cross public lands south of the <br />Lease NC-37210 houndary. The new powerline would begin at the existing 46 KV <br />powerline constructed to Orchard Valley Mine. The eastern portion of the right- <br />of-way would be located in Section 24. It would be approximately 2,000 ft, long <br />(approximately 1,300 feet on public lands) and run in a generally west direc- <br />tion, At the north boundary of Section 25, the powerline would crass into CWI- <br />owned surface property, The alignment would then change and run in a northwest <br />direction toward the proposed Orchard Valley West facilities. It would cross <br />Section 24 and enter Section 23, This northwest line would he approximately <br />6,000 ft, long to the proposed mine site, though this segment of the R,O,W. <br />would end at the southern boundary of Lease kC-37210 and be approximately 4,700 <br />feet in length, <br />CWI currently projects that the powerline would be required for 25 years. If <br />the coal reserve has not been exhausted, additional time would he necessary, <br />The powerline once constructed, would be utilized 365 days per year, 24 hours <br />per day. <br />The powerline would supply Orchard Valley West Mine facilities with electrical <br />power to run a ventilation fan, on an interim basis coal handling facilities, <br />and a small shop 8 warehouse, <br />It is anticipated that construction of a powerline would last approximately 4 to <br />6 weeks. The construction phase would entail construction surveys, temporary <br />roads where necessary to access pole placement locations, actual pole placement <br />construction, hardware added to poles, and finally completion of the powerline. <br />Temporary work areas needed for construction would be located on CWI-owned sur- <br />face properties, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.