Laserfiche WebLink
reclamation of temporary diversions is found in Section 2.05.4. None of <br />the proposed temporary diversions will be located so as to increase <br />potential for landslides. Channel lining riprap and energy dissipators <br />will be used when necessary. Sunbelt does not anticipate that there <br />will be any significant excess material resulting from the construction <br />of diversion ditches. <br />No permanent diversions have been designed or will be constructed at the <br />planned operation. Likewise, none of the temporary diversions will <br />handle runoff from an area with a watershed greater than one square <br />mile. <br />None of the proposed diversions will drain into the underground <br />operation. <br />4.05.4 Stream Channel Diversions (Relocation of Streams) <br />• Sunbelt will divert or relocate no intermittent or perennial streams <br />within the permit area. Therefore, the requirements of this Section are <br />not applicable to the operation. <br />4.05.5 Sediment Control Measures <br />Sediment control measures to be implemented are shown on the Drainage <br />and Sediment Control Plan Map (Map 6). These facilities, consisting <br />primarily of diversion ditches and a sedimentation pond, will be <br />located, constructed, and maintained to avoid erosion and increased <br />contribution of sediment load to runoff. Discussion on sediment and <br />drainage control is presented under Section 2.05.6. <br />If encountered during the underground operation, water will be treated <br />in underground sump areas prior to discharge. Presently, any water <br />encountered in the underground operation is utilized to facilitate dust <br />control underground, .and no water will be pumped to the surface. <br /> <br />4.05-4 <br />