Laserfiche WebLink
<br />Information included stream alpha lists, water <br />decrees, well germits and surface-water diversion <br />records; <br />c. field verification of the existence and condition <br />of key components o£ the 8ighline Canal and Sts <br />. laterals, headgates, turnouts, and split boxes. The <br />locations of potentially impacted water rights were <br />also verified in the field; <br />d. review of the water requirements during and after <br />mining; <br />e, assessment o£ the potential Impact to water rights <br />i which may result from mining and reclamation <br />• operations; and <br />f. development of an augmentation plan to mitigate <br />potential impacts to water rights, and a monitoring <br />plan to indicate changes in the surface-water flow <br />and water levels adjacent to the N[TCLA EAST pit. <br />This report presents the results of GEOTRAtis' study. <br />Yeabody's owned, leased and optioned land and water <br />resources are presented in Chapter 2.0. The operational and <br />3 <br />GEOnZANS. INC. <br />~vsen Make zoos Attachment 2.05.3(3)-16-~t8 <br />