Laserfiche WebLink
<br /> <br />R8 CW 55 <br />Peabody Coal Co. <br />Page 10 <br />delivery will Se appror.ima rely twice the <br />c alcul a[ed impact. The total mitigation <br />supply required is approximately 48.4 of per <br />year, to be delivered between April 19 apd <br />October 26 of each year. These deliveries <br />will be dist r. ibuted as follows: 95.2 acre <br />fee[ to Calamity Draw, and 3.2 acre f_et-to <br />Tuttle Draw. <br />(2) Industrial Use: <br /> (a) All domestic or indoor water requirements <br /> for potable wa tar will be me[ 6y using <br /> treated water supplied by the Town of tiucla <br /> under its 'own separate water rights. <br /> Applicant will 'not make any diversions for <br /> potable wa [e r. supply. <br /> (b) Ind UStr"ial use of water at the Nucla and <br /> Nucla East nines consists of <br />+eevapo, ~a t <br />ion <br /> , <br />~ <br />from. the po nd~s and ~appl icatio n_of <br />rya ke r <br />to <br /> " <br />~ <br />^ the soil"for compac tion~a~6dws t~ <br />supp~e~`sson <br />wi[hi n th <br />i <br />"' ~ '~ <br />e <br />• I _ <br />e m <br />ne ar <br />as. <br />._ .. -... .. <br />(c) Evaporation h <br />b <br /> as <br />een calculated using pan <br /> evaporation data from the I9ontrose, Colorado <br /> weather. station, adjusting for elevation <br /> differences between rto ntrose and Nucla. <br /> Evaporation losses from the ponds are <br /> . considered a 100$ consumptive use of water. <br /> (d) Water requirements for compaction and dust <br /> suppression have been estimated based on <br /> anticipated overburden handling procedures <br /> at each mine. These uses are also 100$ <br /> consumptive. <br /> (3) Table 1 attached to this Ruling summarizes the <br />e <br />`~ <br />' <br /> s <br />E im <br />a red monthly and annual mitigation and <br />7 <br /> industrial water requirements. "~gplic ant. <br />yj 11 <br /> . <br />use 97.7 acre feet, and consume 99.3"af ,,. per <br />year <br />under thi <br />o <br />~ <br />~~~~ ~~~ <br /> " <br />s plan f <br />r augments tion <br />. <br /> C. Wa teT $uDDly and Operation: <br /> (1) Applicant will utilize two"sources of water to <br /> meet its industrial and mitigation water~require- <br /> ments under this plan for augmentation: ttie"sub- <br /> <br />REVISED MARCH 2006 Attachment 2.05.3(3)-16-31 <br />