My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131108
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:58 PM
Creation date
11/25/2007 10:54:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Doc Name
SAE Sedcad Runs (Revised TR-54)
Section_Exhibit Name
Illustration 44 PART 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V~'urksheet 3: Time of concentration (Tc) or travel time (Tt) <br />Project SDHr4 AREA "A" ey DGA Date 7/1/93 <br />Location Checked Date <br />• <br /> <br />Circle one: Present Developed <br />Circle one: Tc TC through subarea <br />NOTES: Space for as many as cvo segments pet flow type can be used for each <br />worksheet. <br />Include a map, schematic, or description of floe segments. <br />Sheet floe (Applicable to T <br />only) Segment ID <br /> c <br />1. Surface description (table 3-1) ............ <br />2. Manning's roughness coeff., n (table 3-1) .. 0.13 <br />3. Flaw length, L (total L < 300 ft) .......... ft 200 <br />4. Tvo-yr 24-hr rainfall, P2 .................. in 1„ <br />5. Land slope, s .............................. ft/ft 0.30 <br /> 0.8 <br />0.00 <br />7 <br />(n <br />L) <br />+ <br />6. Compute Tt ...... <br />T hr 0.15 <br /> 0 <br />5 <br />O <br />4 <br />t <br /> P2 s <br />Shallow concentrated flow Segment ID <br />7. Surface description (paved or unpaved) ..... <br />8. Flow length, L ............................. ft <br />9. gatereourse slope, s ....................... ft/ft <br />10. Average velocity, V (FSgure 3-1) ........... ft/s <br />11. Tt 3600 V Compute TC ....., hr + <br />Channel floe Segment ID <br />12. Cross sectional floe area, a ............... ft2 <br />13. 47ected perimeter, pv ....................... ft <br />14. Hydraulic radius, r <br />= Compute r ....... fc <br /> P <br />v <br />15. Channel slope, s ........................... ft/ft <br />16. Hanning's roughness coeff., n .............. <br /> 2/3 1/2 <br />1.49 r <br />a <br />17. V <br />Compute V ....... ft/s <br /> n <br />18. Flow length, L ............................. ft <br />0.15 <br /> <br />19. Tt 3600 V Compute TC ,,.... hr + <br />20. Yacershed or oubaree Tc or TC (add Tt in steps 6, 11, and 19) ....... hr 0.15 <br />42-2 <br />(210-VI-TR-55, Second Ed., Tune 1986) D•3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.