Laserfiche WebLink
• 2.05.3 <br />2) Haul Road along old railroad bed. <br />General Requirements <br />This road segment is approximately 2,600 feet long. Reference Map 16, <br />Haul Road Plan & Profile - Loadout Loop & Gob Pile. This road provides <br />access to the gob pile and sediment ponds C & D. Drainage from the <br />majority of this road is not contained in any sediment ponds. <br />Dust control on this road segment includes gravel surfacing and watering to <br />maintain surface moisture. <br />Alternative sediment control will be utilized to assure that erosion, siltation, <br />pollution of air or water, and damage to public property will be controlled. <br />The use of dust and alternative sediment control will assure that no damage <br />to fish and wildlife or other related environmental values will occur. <br />The truck traffic which will utilize this haul road segment will be 10 wheel haul <br />• trucks. A 20-foot wide road surface should be adequate for these haul <br />trucks. Vehicle traffic should have no problem with this road configuration. <br />The majority of this road segment is relatively flat. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />Drainage <br />The discussion of drainage presented above under the discussion of the <br />main haul road is applicable to this road segment except drainage from this <br />road segment does not pass through a sediment pond. Drainage from this <br />• road segment will be routed off the road surface into collection ditches off of <br />PR-06 2.05 - 22 - 8/01 <br />APP~Pov~ <br />~~/5/0 2 <br />