My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE131080
DRMS
>
Back File Migration
>
Permit File
>
400000
>
PERMFILE131080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:31:56 PM
Creation date
11/25/2007 10:53:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
3/21/2003
Doc Name
pages 2.05-1 through 2.05-58i
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.3 <br />2) Haul Road along old railroad bed. <br />General Requirements <br />This road segment is approximately 2,600 feet long. Reference Map 16, <br />Haul Road Plan & Profile - Loadout Loop & Gob Pile. This road provides <br />access to the gob pile and sediment ponds C & D. Drainage from the <br />majority of this road is not contained in any sediment ponds. <br />Dust control on this road segment includes gravel surfacing and watering to <br />maintain surface moisture. <br />Alternative sediment control will be utilized to assure that erosion, siltation, <br />pollution of air or water, and damage to public property will be controlled. <br />The use of dust and alternative sediment control will assure that no damage <br />to fish and wildlife or other related environmental values will occur. <br />The truck traffic which will utilize this haul road segment will be 10 wheel haul <br />• trucks. A 20-foot wide road surface should be adequate for these haul <br />trucks. Vehicle traffic should have no problem with this road configuration. <br />The majority of this road segment is relatively flat. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />Drainage <br />The discussion of drainage presented above under the discussion of the <br />main haul road is applicable to this road segment except drainage from this <br />road segment does not pass through a sediment pond. Drainage from this <br />• road segment will be routed off the road surface into collection ditches off of <br />PR-06 2.05 - 22 - 8/01 <br />APP~Pov~ <br />~~/5/0 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.